Tag: транспорт

  • A fare increase has been announced in Kyiv A fare increase has been announced in Kyiv

    A fare increase has been announced in Kyiv A fare increase has been announced in Kyiv

    At the request of the relevant departments of the Kyiv City State Administration and the trade unions of the city’s transport companies, the Departments of Economy and Transport were tasked with preparing detailed calculations regarding a possible review of public transport fares in the capital.

    Currently, the cost of travel in Kyiv is reportedly the lowest among all cities in Ukraine and has not been revised since 2018. However, the constant rise in prices for fuel, electricity, consumables and logistics is forcing the city authorities to bring the cost of travel closer to an economically justified level. This was announced by the city’s mayor, Vitali Klitschko, on his Telegram channel.

    At the same time, in order to implement measures to strengthen the city’s energy resilience, the Kyiv City Council will be forced to review the capital’s budget allocation. It is worth noting that the capital’s transport system is subsidised. For example, 12 billion hryvnias have been allocated for the current year. At the same time, the state has long failed to fulfil its obligations to compensate the city for the costs of free travel for eligible passenger categories. Every year, these costs, amounting to hundreds of millions of hryvnias, are covered by the capital’s budget.

    Reducing the significant level of transport subsidies will provide an opportunity to allocate part of the savings, in particular, to preparations for the upcoming heating season.

    It was previously reported that an additional train will run from Kyiv to Dnipro.

  • Prospect Beresteiskyi: what is one of the longest highways in Kyiv known for

    Prospect Beresteiskyi: what is one of the longest highways in Kyiv known for

    Prospect Beresteiskyi is one of the longest and most important thoroughfares in Kyiv, stretching for about 11.8 km through the Shevchenkivskyi, Solomianskyi, and Sviatoshynskyi districts. (more…)

  • Cycle paths and parking: what Kyiv can learn from cities in Europe and the US

    Cycle paths and parking: what Kyiv can learn from cities in Europe and the US

    Idea No. 1: A major priority for the development of cycling infrastructure in the capital is to replace some car parks with cycle lanes. The current situation in Kyiv is that most central streets are congested with cars, and cyclists lack safe and well-designed routes. In 2025, the city authorities announced plans to create special lanes for bicycle transport, which will improve road safety, reduce traffic jams and promote this environmentally friendly mode of transport among residents.

    This practice has long been in place in many European cities, where cyclists have priority on separate lanes and some car spaces have been eliminated in favour of cycling. The situation in Europe shows that such changes not only improve convenience for citizens, but also reduce air pollution, create comfortable conditions for residents and tourists, and promote the development of sports culture.

    The authorities will develop cycle routes for Kyiv

    The next step for Kyiv will be to develop a comprehensive system of cycle routes connecting the central areas of the city with its outlying districts. This project involves the creation of safe, logically designed paths where cyclists can travel quickly and conveniently without disturbing pedestrians and cars. The situation in Kyiv shows that many areas remain isolated from the centres of active two-wheeled transport, and new routes will be an effective solution to this problem, encouraging cycling.

    In European countries, particularly the Netherlands, Denmark and Germany, cycle routes have long been integrated into urban infrastructure. An extensive network of paths has been created there, allowing people to quickly reach any point in the city without using a car. The situation in Europe shows that such projects increase travel safety, encourage a healthy lifestyle and make cities more attractive to tourists, while reducing traffic congestion.

    By 2026, Kyiv plans to radically review its approach to parking and cycling infrastructure. Cyclists will get a network of well-designed, safe routes, and some car parks will be converted into cycle lanes or green areas. This will not only improve the city’s logistics and speed of travel, but also enhance the capital’s environmental credentials, making Kyiv more comfortable and safer for residents and visitors alike.

    Bicycle lanes will become part of a comprehensive approach to modernising urban infrastructure, combining transport convenience with environmental concerns.
    The current situation in Kyiv is forcing the authorities to seek optimal solutions, and the example of European cities shows that the consistent and systematic introduction of cycle routes and lanes can significantly improve the quality of life in a large metropolis, stimulate an active lifestyle and create a new culture of mobility for Kyiv residents.

     

  • The speed limit has been reduced on certain sections of roads in Kyiv: list of streets

    The speed limit has been reduced on certain sections of roads in Kyiv: list of streets

    On 1 November, a new regulation came into force in two major Ukrainian cities – the capital and Dnipro – reducing the maximum speed limit on certain roads. This is part of a systematic approach by local authorities to improve road safety and reduce the risk of accidents.

    A new speed limit has been introduced on four key sections of the city network in Kyiv: instead of the previous 80 km/h, the maximum speed is now 50 km/h. In particular, the changes affect the following routes:

    • Naberezhne Highway from the square to Naddnipryansky Highway
    • Roman Shukhevych Avenue between the Pivnichny Bridge and Honore de Balzac Street
    • Stepan Bandera Avenue from Yordanska Street to the Pivnichny Bridge
    • Naberezhno-Rybalskaya in the direction from Elektrykiv Street to the Havansky Bridge

    In the city of Dnipro, changes have also been introduced on several important highways and bridge crossings: there, the speed limit has been reduced from 70 km/h to 50 km/h. Among these sections are Naberezhna Zavodska Street; Naberezhna Peremohy Street (from Yaruzhna Street to Kosmichna Street); Zaporizke Highway from Shynna Street to Aeroportivska Street; Donetsk Highway from the intersection with Berezinska Street to the corresponding road sign; Soniachna Naberezhna Street from Lyubarskyi Street to the Samara Bridge; Central Bridge; Kaidatsky Bridge; Ust-Samara Bridge.

    Along with the update of traffic rules, the automated speed control systems were reconfigured. Inspection complexes and cameras for recording violations must be adjusted to the new traffic parameters, i.e. they switch to traffic control with a maximum speed limit of 50 km/h where this is established by city council decisions. In Kyiv, such a control system is in operation, among other places, on Naberezhne Highway No. 4, and in Dnipro – on Naberezhna Zavodska Street, No. 64, and Naberezhna Peremohy Street, No. 38-A.

    According to law enforcement officials, this initiative is motivated by a desire to reduce the number of traffic accidents, especially in areas with heavy traffic, and to improve the safety of pedestrians, cyclists and all road users. Reducing the maximum speed to 50 km/h is in line with international recommendations for cities with high population density and a large number of intersections, pedestrian areas and public transport.

    In addition, local authorities point out that such measures also have a socio-economic aspect: lower speeds on busy roads reduce noise pollution, improve the microclimate in surrounding areas and make it more comfortable for residents to move around the city.

    Speed limits in Kyiv – what changes in November

    The transition to the new regime means that drivers need to be especially careful: changing traffic rules is not just a new sign or signal, but also the need to adapt driving to infrastructure conditions. For example, in areas where a speed of 80 km/h was previously allowed, a reduction to 50 km/h creates a different pace of traffic and different dynamics, which also requires adaptation – both from drivers and from the transport infrastructure.

    For city dwellers, this means that more time should be allowed for travel on several key arterial roads, as reduced speeds may mean longer journey times. At the same time, it is expected that the reduction in accidents and increased safety will outweigh the slight loss of time.

    The executive committees of the local councils that adopted these decisions note that further steps will include monitoring the results of the changes – checking accident statistics, assessing traffic convenience, analysing traffic jams and the impact on public transport. If the results are positive, further adjustments may be made, such as reconfiguring sections of road and possibly extending this approach to other thoroughfares.

    Therefore, reducing the maximum speed limit on certain sections of roads in Kyiv and Dnipro is a conscious step towards safer urban traffic, adapted to the conditions of modern megacities with heavy traffic. It demonstrates that cities are not only modernising their infrastructure but also changing the rules of the game for the comfort and safety of their citizens.

    As a reminder, the Darnytskyi tram depot has completed a major overhaul of the fourth Tatra T3 tram car.

  • Speed limits introduced in Kyiv from 1 November

    Speed limits introduced in Kyiv from 1 November

    From 1 November, cars in Kyiv will be limited to a speed of 50 km/h. This was announced by the Traffic Management Centre (TMC).

    The changes will apply to the following streets:

    • Roman Shukhevych Avenue (from Pivnichny Bridge to Honoré de Balzac Street);
    • Stepan Bandera Avenue (from Yordanska Street to Pivnichny Bridge);
    • Naberezhne Highway (from Poshtova Square to Naddnipryanske Highway);
    • Naberezhno-Rybalskaya Street (only in one direction – from Elektrykiv Street to Havansky Bridge).

    Municipal authorities urge drivers to be careful, obey traffic rules and comply with the updated restrictions. They ask drivers to be especially careful near pedestrian crossings, educational institutions, and places where traffic accidents are common.

    As a reminder, the Darnytskyi tram depot has completed a major overhaul of the fourth Tatra T3 tram car.

  • 19-year-old man stole a Mercedes minibus from his workplace

    19-year-old man stole a Mercedes minibus from his workplace

    Construction work in the Kyiv region ended with the theft of a minibus belonging to the owner of the property. In the Vyshhorod district, a 19-year-old man decided to steal the vehicle while he was working. This was reported by the National Police press service on Facebook.

    The theft of a Mercedes Sprinter minibus took place in the village of Rovy. The young man was performing construction work on the property of a married couple. He was temporarily living on the property with the owner’s consent. Later, the worker decided to commit a crime.

    He made sure that no one was watching his actions, took the keys to the car, which was located next to the yard, from the house and illegally took possession of it.

    Law enforcement officers found the offender in the village of Dymer. The minibus was seized and placed in an impound lot.

    Criminal proceedings have been initiated. The young man faces up to five years in prison.

    We remind you that the driver of a Mitsubishi Lancer, travelling in the left lane, hit a pedestrian. The man died from his injuries.

     

  • Will there be an evacuation from Kyiv: the Ukrainian capital’s authorities have spoken out

    Will there be an evacuation from Kyiv: the Ukrainian capital’s authorities have spoken out

    Buses in Kyiv are not being prepared for the evacuation of the population. The situation is currently under control, and the statement about alleged preparations has been taken out of context. This was reported by the press service of the Kyiv City State Administration on Telegram.

    Specialists from the Kyiv City State Administration’s motor transport enterprise are currently repairing and refurbishing vehicles at the request of the military. They are also working on converting a bus for resuscitation and evacuation purposes, which will allow the evacuation of seriously wounded people from the front line.

    ‘We ask the media and bloggers not to spread false information and not to create reasons for panic,’ the post says.

    Buses in Kyiv – how repairs are carried out

    The Kyiv City State Administration also showed how scheduled repairs are progressing. The work is being carried out by specialists from Kyivpastrans.

    Medium repairs help to extend the service life of electric transport. One repair takes about a month and is carried out once every 2-3 years.

    Specialists carry out the following work:

    • repair the body and replace the floor;
    • repairing and, if necessary, replacing seats;
    • updating electrical, pneumatic and mechanical equipment;
    • carrying out painting work.

    The heating system in the passenger compartment and driver’s cab is also being restored, adjusted and checked in order to prepare the transport for winter.
    All trolleybuses are low-floor and barrier-free, with ramps, spaces for people with disabilities and prams.


    We would like to remind you that another renovated tram has appeared on the capital’s tracks. The Darnytskyi tram depot has completed a major overhaul of the 4th Tatra T3 tram car.

  • Another refurbished tram has appeared on the capital’s tracks

    Another refurbished tram has appeared on the capital’s tracks

    The Darnytskyi tram depot has completed a major overhaul of the fourth Tatra T3 tram car.

    The modernised tram is already carrying passengers after passing tests on the line. This was reported by the press service of the Kyiv City State Administration.

    During the repair, special attention was paid to comfort and safety:

    Heating system, passenger information system and video surveillance system were installed;

    • electrical equipment, passenger seats and doors were updated;
    • energy-saving lighting and ceilings were installed;
    • yellow warning stripes were applied to the stairs for passenger convenience.

    After the overhaul, an air conditioning system was installed.

    The overhaul of the tram car began in August this year. On average, such repairs take 3-4 months, depending on the technical condition of the rolling stock and the availability of the necessary spare parts.

    Under martial law, the work may take longer. However, the specialists of Kyivpastrans are working hard to complete the repairs as quickly as possible and return the tram to service.

    At the same time, major repairs are continuing at the Podil tram depot and the Shevchenko depot.

    Each major repair extends the tram’s ‘life’ by another 10 years and makes trips safer and more comfortable for city residents.

    We would like to remind you that the legendary retro tram M2-M ‘1892’ has been returned to the historic Podil district. Specialists from the Darnytskyi depot carried out the necessary restoration work.

  • Traffic paralysed on North Bridge due to accident

    Traffic paralysed on North Bridge due to accident

    A traffic accident in Kyiv paralysed traffic on the North Bridge. This was reported by the police press service on 16 September.

    The accident caused a huge traffic jam on the bridge. Drivers are asked to plan their routes in advance and choose detours.

    Law enforcement officials will provide details of the incident later.

    Northern Bridge in Kyiv

    The Northern Bridge in Kyiv across the Dnipro River connects the right-bank residential areas with large residential areas such as Raiduzhny, Voskresenka, and Troieshchyna. Its length is 816 metres, and the bridge across Desenka is 732 metres long.

    A single-pylon cable-stayed system spans the navigable part of the Northern Bridge. It is located near the left bank; the right bank part of the bridge is an overpass with 63-metre spans.

    Until 2005, motor vehicles travelled in three lanes in each direction. A reversible lane was added by municipal services in August of the same year, which led to a significant increase in accidents on the bridge. In order to reduce the number of accidents and casualties, the reversible lane was replaced with a guardrail on 24 December 2007. At the same time, the number of lanes was increased to four in each direction due to their reduced width.

    The Northern Bridge remains the most accident-prone section of Kyiv. Accidents are usually recorded during the morning or evening rush hour, leading to traffic gridlock in the Ukrainian capital.

    Due to accidents on the North Bridge, traffic jams can stretch from it along Stepan Bandera Avenue, Olena Teliga Street, Vadym Hetman Street, Chokolivsky Boulevard to Sevastopol Square and further into the centre of the metropolis. The length of such a traffic jam can reach over 15 km.

    Residents of the capital explain such high accident and mortality rates in different ways.

    Sometimes it is related to the road surface itself, as some Kyiv residents say, when trucks drive onto the bridge at high speed from one end, and at the other end, a car can be thrown several metres away. They also claim that where the Northern Bridge in Kyiv crosses to the Left Bank, there used to be an old cemetery where the residents of Vygurivshchyna were buried.

    We would like to remind you that Ukrzaliznytsia carried out significant work in the Kyiv region to eliminate the consequences of the emergency. The Vasylkiv-1 — Boyarka section was restored for train traffic in the shortest possible time.

  • Traffic will be partially restricted in Dniprovskyi district of Kyiv on 14-15 May

    Traffic will be partially restricted in Dniprovskyi district of Kyiv on 14-15 May

    Traffic will be restricted in the Dniprovskyi district of Kyiv. Part of the area will be closed to traffic. This was reported by the press service of the Kyiv City State Administration.

    The temporary changes will be in effect from 08:00 to 19:00 at the intersection of Budivelnykiv Street and Verkhovna Rada Boulevard, the KCSA said.

    At this time, road builders will be laying the top layer of asphalt at the intersection.

    Дніпровський район обмеження руху
    Dniprovskyi district and traffic restrictions/KCSA

    On 11 May, trams 22, 27, 28, 33 and 35 resumed running on Ostafiy Dashkevich Street.